St. Croix River Bridge Geotechnical Information


The following files are available. To download, right click below on the file for the project of interest.

St. Croix River Bridge Geotechnical Information
Boring Plan (entire bridge)
Boring Plan (1 of 3))
Boring Plan (2 of 3))
Boring Plan (3 of 3))
Field Logs
Final Boring Logs
Final Boring Logs T300 and T500 series (2013-2013)
Foundation Borings Index Sheet (Description of Terms)
St. Croix River Bridge Preliminary Foundation Report
St. Croix River Bridge Load Test Report (1995)
St. Croix River Bridge Load Test Addendum Report (1995)
Preliminary Foundation Evaluation and Geotechnical Review (Dan Brown, 2007)
Final Report of Axial STATNAMIC Load Testing Test Piles (2012)
Final Report of Lateral STATNAMIC Load Testing Test Pile P-B-1 (2012)
Final Report of Lateral STATNAMIC Load Testing Test Pile P-B-3 (2012)
Final Report of Lateral STATNAMIC Load Testing Test Shaft (2012)
Disclaimer
 
Questions or Comments about Files

Office of Materials & Road Research  E-mail: MaterialsLab.DOT@state.mn.us  1400 Gervais Avenue  Maplewood, MN 55109-2044  Phone: (651) 366-5592  FAX: (651) 366-5461
© 2014 Minnesota Department of Transportation  395 John Ireland Boulevard  St. Paul, MN 55155-1899  Phone: 800/657-3774  800/627-3529(TTY, Voice, ASCII) A to Z | Getting Around | About MnDOT | Accessibility | Disclaimer and Legal | Doing Business | Contact MnDOT | News Room | 511 Traveler Service | Careers/Jobs | Search MnDOT.gov | State of Minnesota | Governor's Site
Last Updated: Monday, March 18, 2013 - 3:13:14 p.m. Central Daylight Time